L'Abeille 2
L’Abeille’s New Hive
L'Abeille 2
Historically a manufacturer of soft drinks and syrups, L’Abeille is building a new plant in Mazières-en-Mauges, near Cholet, called L’Abeille 2.
250
jobs
in the long run
a few
key figures
about
L’Abeille 2
key figures
about
L’Abeille 2
15,000
packages per hour
a single production line can package up to 20,000 packages per hour.
40,000
pallet spaces
With a 32-metre-tall warehouse (15 levels), 100 m deep, L’Abeille will benefit from 90,000 m² of storage space.
€140 million
the cost of the investment
The first groundbreaking work dates back to May 2021.
400 million
packages per year
this is the planned production capacity, nearly 3 times greater than the historic Cholet site.
Construction Update in Video
Here is the latest video update we produced at the start of 2023